TEL:86-10-62607585 FAX:86-10-62607585 WEBSITE:www.isa-world.org
HOME > ISA TCS > Working Groups

WG10

Problem Statement: please summarize the problem to be addressed.

There is a lot of lighting control protocols used in smart home, such as Bluetooth, ZigBee and Wi-Fi, it isurgent to know what the right protocol is in different scenario in smart home lighting.

Proposed Output: typically an ISA Recommendation, with a working title:Technical report or white paper on:

 

This work will be refer to CSA TR004.

Goals: please outline goals for the proposed project.Edit ISA Technical report to give a guideline of lighting control protocol for smart lighting.The purpose of this technical report is to sort out the composition and requirements of LED smart homeconnected lighting control system, analyze the existing control protocol and standards according to theapplication scene requirements, provide technical guidance for ISA members, and provide technicalsupport for the standardization work in the future.This is a technical report (informative document), not a standard (normative document). 

Positioning of this report: easy to understand, present complex contents lucidly, elaborate key aspects and problemsof the industry development technology and standardization, and gives suggestions to standardization.

Committee or Subcommittee: please list at least three proposed committee or subcommittee members,complete with contact information.

  1. Feng Huang Philips Lighting (China) investment Co.,LtdEmail: feng.huang@philips.com

  2. XiaoDong Wang Hangzhou Honyar Electrical Co., Ltd.

  3. Fan Zhang Xianmen Hualian Electronics Co.,Ltd

  4. JunBin Zhang OSRAM China Lighting Ltd.

Timeline: please list approximate dates of completion:

Initial outline: Appendix 3

Initial draft for TCS Chair review: Submit it in two weeks since the proposal approved.

Draft for TCS member review and comment: Submit it in two weeks since the amendments of draftproposed and reviewed by chairman.

Committee or Subcommittee final draft: Submit it after the comments of exposure draft proposedby committee members.

Publication: Publish it in one week after passing the voting procedure of ISA TCS.

Appendix:

  1. Global industry background

  2. The necessity to develop the standard

  3. Initial outline4. Relevant standards