TEL:86-10-62607585 FAX:86-10-62607585 WEBSITE:www.isa-world.org
HOME > ISA TCS > Working Groups

WG30

Proposed title of publication

Performance Requirements on LED Mosquito repellent Light


Proposed publication type:  

ISA Recommendation  


Proposed WG leader: 

Ms. Xu XU , Ningbo Dayang Technology Co,Ltd, CN, 3003976676@qq.com, China


Initial WG members:

1. Mr. Jun ZHENG, Zhejiang Xiaozheng Technology Co,Ltd, CN

2. Mr. Yuanai NING, Ningbo Dayang Technology Co,Ltd, CN

3. Mr. Hao XU, China Solid-State Lighting Alliance, CN

4. Dr. Hua YANG, Institute of Semiconductor, CAS, CN

5. Prof. Jianwei SU, Institute of Zoology, CAS, CN

6. Dr Wei LI, Ningbo Institute of Materials Technology and Engineering, Chinese Academy of Sciences, CN

7. Mr. Isac Roizenblatt, Technical Director of Abilux, isac.roizenblatt@gmail.com, Brazil

8. Mr. Nguyen Doan Thang, Vietnam Lighting Association (VLA), Vietnam


Problem Statement: in a sentence or two, please summarize the problem and the needs to be addressed.

With the development of LED lighting technology and market, the LED technology has been widely used in mosquito control and researched in different institutions and enterprises. But there are two problems needed a technology report to be suggested. 1. How can we evaluate the LED mosquito repellent light?  2. What is the test method?

 

Goals: please outline goals for the proposed project and provide brief outline of proposed document.

This document will effectively clarify the product parameters and performance indicators of LED mosquito repellent light, and further standardize the existing  LED mosquito repellent light market.

 

 

Not Redundant Statement:  Check and report that the proposed work is not covered already by standards or publications already published or being developed by other international organizations.

Relevant standards

[1] T/CSA 075-2023 Technical specification on outdoor ultraviolet LED mosquito light trap

[2] T/CSA073-2021 Performance requirements on indoor ultraviolet LED mosquito light trap

[3] GB/T 2900.652004 Electrical Engineering Terminology Lighting

[4] GB 4706.1-2005 General requirements for the safety of household and similar electrical appliances

[5] GB 4706.762008 Special requirements for the safety of household and similar electrical appliances and insect traps

[6] GB 17625.12012 Electromagnetic compatibility limit Harmonic current emission limit (equipment input current per phase 16 A)

[7] GB/T 177432017 Limits and measurement methods of radio disturbance characteristics of electrical lighting and similar equipment

[8] GB/T 185952014 General lighting equipment electromagnetic compatibility immunity requirements

[9] GB/T 20145 Photobiological safety of lamps and lamp systems

[10] GB/T 24689.22017 Plant protection machinery insecticidal lamp

[11] GB/T 24824 Test method of LED module for general lighting

[12] GB/T 27785 Laboratory effect determination and evaluation of sanitary insecticidal equipment

[13] GB/T 337212017 Test method for reliability of LED lamps

[14] GB/T 237972009 Vector density monitoring method Mosquitoes


Timeline: approximate dates of completion of WG draft (maximum x years):

       Initial outline: See Appendix.

Initial draft for TCS Chair review: Submit it in six months since the proposal approved.

Draft for TCS member review and comment: Submit it in three months since the amendments of draft proposed and reviewed by chairman.

Committee or Subcommittee final draft: Submit it in two months since the amendments of draft reviewed by TCS member.

Publication: Publish it in one month after passing the voting procedure of ISA TCS.