Proposed title of publication:
Technical Specification for Smart Lighting Pole
Proposed publication type: ISA Recommendation or ISA Technical Report
ISA Recommendation
Proposed WG leader: name, affiliation, e-mail address, country
Mr. Wenjun Ma, Zhejiang Branch of China Tower Corporation Limited, Hangzhou, China, mawj@chinatowercom.cn
Initial WG members: Name, affiliation, email-address, country (include members from at least three countries)
1. Dr. Alexander Karev, Russian Association of LED Equipment Manufacturers (APSS), Russia, a.karev@ltcompany.com
2. Mr. Nguyen Doan Thang, Vietnam Lighting Association (VLA), Vietnam, hoangha022009@gmail.com
3. Fan HE, Huaxin Consulting CO., Ltd., China, hefan.hx@chinaccs.cn
4. Guang Zeng, Hangzhou Wanwu Internet Intelligent Industry Co., Ltd., China, 15805807755@139.com
Problem Statement: in a sentence or two, please summarize the problem and the needs to be addressed.
All cities in the world are using a large number of various types of light poles, resulting in the appearance of the city is chaotic, the repeated construction of light poles has also caused a serious waste of resources, the smart light poles proposed by this standard is to standardize the design and construction requirements of light poles, and at the same time realize intelligent information processing functions, ensure road traffic travel safety and public travel convenience, maintain a good urban appearance, use urban road space in a reasonable and orderly manner, and build a more livable urban environment.
Goals: please outline goals for the proposed project and provide brief outline of proposed document.
Technical standard for smart lighting pole is formulated with a view to standardize the technical requirements and application of smart lighting pole system, promote the integration of municipal infrastructure and mobile communication facilities, speed up the construction of 5G networks, to ensure advanced technology, economy and rationality, safety and reliability, ensure engineering quality.
Not Redundant Statement: Check and report that the proposed work is not covered already by standards or publications already published or being developed by other international organizations.
The proposed work is not covered already by standards or publications already published or being developed by other international organizations.
Timeline: approximate dates of completion of WG draft (maximum x years):
Initial outline: See Appendix.
Initial draft for TCS Chair review: Submit it in six months since the proposal approved.
Draft for TCS member review and comment: Submit it in two months since the amendments of draft proposed and reviewed by chairman.
Committee or Subcommittee final draft: Submit it in one months since the amendments of draft reviewed by TCS member.
Publication: Publish it in one month after passing the voting procedure of ISA TCS.