TEL:+86-01-82385580-667/668 FAX:+86-01-82388580 WEBSITE:www.isa-world.org
HOME > ISA TCS > TCS Meetings
TCS 1 Meeting
Release time: Mar 24, 2025



The Report of the 1st Meeting of

ISA Technical Committee on Standardization (TCS1)


The 1st Meeting of the ISA Technical Committee on Standardization (TCS1) was held on June 9th, 2012 at Westin Hotel, Guangzhou, China, which was attended by over 20 representatives from research initiatives, corporations, and organizations, including Cree, Semileds, Philips, Osram, CSA, APT HK, Hyosung, Instrument Systems, Kaneka, Nichia, Lattice Power, etc.

 

1.  Mark McClear’s presentation on:

1)  The purpose of this meeting was to determine 3-5 areas of ISA interest; form sub-groups to study each area; set meeting date, time for second TCS meeting, receive sub-group reports.

2)  The principle was meaningful – should have impact; not redundant – should leverage work and standards of other global organizations; doable – does not require massive scientific studies, and Other…

3)  Systematic review of existing SSL standards, finding the black spaces, meaning what others are already doing.

4) Cree’s Feedback on ISA Strategic Agenda on Testing, calling for more members to make comments and cross-compare items by items

5) Introduction of TEMPO 21 testing method, stressing on the point that “Industry Standards DO NOT guarantee Good Luminaire”, where TEMPO would fill in the gaps for guiding the users in terms of application precautions of LED, such as chemical compatibility etc.

6)  Ideas on next step

  

2.      Secretary General Ruisheng Yue’s Remarks:

1)      Regarding the goal and approach of TCS:

  - “chicken” & “egg” both, in parallel, while TCS’s meeting could be the egg

- “forest” & “trees”, while we can start from “trees”, and never lose the vision of “forest”

      2) Procedure for next steps

     - TOR & Mission Statement (adopted by Mr. Mark McClear)

      - Identify the priority subjects out of today’s meeting

      - Initiator could draft 2-page concept note for team input

      - The meeting minutes and the concept notes would be put online for open review and opinions gathering


3.      Identify direction of TCS, after brain storming 11 topics were identified:

 

No.

Priority Subjects

Adopted by

1

Assembly methods for LED   components and modules

CSA

2

Plant growth LED system,   start with the Communication, which is the “Defining the basic terms, symbols   and other communication tools”

CSA

3

OLED lighting, start   with the Communication

CSA, Kaneka

4

Photo- biological safety

CSA

5

How to classify Lumen   levels as a standard spec for various light fixtures


6

1000~3000 hours   accelerated test method for LED system level reliability

Philips, Semileds, CSA, APT HK,   Cree

7

Harmonize the   international standard related with LED applications

Semileds

8

Medical applications of   LED

CSA

9

Entry level   specification for SSL applications for the mass market (What’s good enough)

Philips, Semileds, Cree, APT HK

10

Recycling and green   design of SSL fixtures

Kaneka

11

Terms and interfaces between   “factory to factory” Communication, vs. “manufacture to consumers”

APT HK

 4.      Other action items

Mark would draft of By Laws & mission statement for TCS

5.      Other comments and suggestions

1)  David Xiao: started the work from the top level communications toward performance, safety, etc.  Named to define the term and wording that consumer cared and understood.

2)   Danny Noh: needed to consolidate standards & labeling, which was part of harmonization; maybe we should set the standard voltage for LED lamp & module


6.      Set meeting date, time for second TCS meeting, receive sub-group reports

1)  Time for next TCS meeting - Guangzhou on Nov. 6 tentatively

2)  TCS meeting minutes would be online within a week

3)   Concept note would be prepared by June 21st

4)   Priority subjects could be added, and each team can be open for more participants by website announcement.

5)   TCS Chair would report the progress of TCS to 2012 ISA General Assembly.

 


  • Full name:

  • Position:

  • Mailbox:

  •